Yx3 80-4 0.75kw High Efficienct Three Phase AC Induction Electric Motor

Yx3 80-4 0.75kw High Efficienct Three Phase AC Induction Electric Motor

 


Y2 Motor Characteristics

Y2 series electric powered motor are entirely enclosed and enthusiast cooled(TEFC),3-stage squire cage induction motor, produced sort of Y collection electries motors with new techbique. The mounting dimension is conformend with the related specifications of IEC requirements.

Y2 sequence electric motor are with stunning determine,compact structure,minimal noise,high efficiency,huge commencing torque,simple procedure,and many others.The motors are adopted with insulation class F and pretrction classip54.These motors are up to the intercontinental regular of nineteen nineties.

Y2 sequence electrical motors are broadly utilized in numerous places,this sort of as HVAC,drilling equipment,pumps,supporters,winches,air compressors,floor cleaning machines,transportation equipment,meals devices,agriculture equipment aand equipments, and so forth

Observe:we can also make CZPT motors in accordance to clients’special  requirements,this sort of as 50hz,60hz,380v,400v,415, 460v,575v,660v: IP55
Insulation course :F.H.

one.In depth Solution Description

one.CE certificate 
two.Copper wire 
three.Chilly-rolled silicon steel sheet

2.Technical specs

one. Silicon metal DR510, 800, 600, 360 regular use stamping of lamination stator and rotor die-casting
2. a hundred% copper winding and inserting stator (guide and semi-routinely)
three. Stator Vacuum impregnation and drying
four. CNC machining motor shaft, frame, conclude shields, etc
5. Professional workman inspecting spare areas every processing
six. CZPT motor assembly product line
seven. CZPT motor will one hundred% check prior to painting. 
8. CZPT motor spray-paint on motor painting solution line
nine. CZPT motor will one hundred% check out once again just before packing. 
An electric motor from materials to complete motor, have to pass fifteen time check out, and one hundred% tests, output electricity,voltage,
electrical current, non-load, fifty% load, 75% load, a hundred% load and check out the nameplate, packing.
Lastly delivery to our consumer.

three.CZPT Data

Variety Output Existing (A) Pace Eff. Energy
Aspect
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .18 .25 .53 .fifty 2720 sixty five .eight five.five 2.2 2.two
Y2E1-632-2 .25 .34 .69 .sixty six 2720 sixty eight .eighty one 6.five 2.2 2.two
Y2E1-711-2 .37 .five .ninety nine .94 2740 70 .eighty one 7 2.2 two.2
Y2E1-712-two .fifty five .75 1.forty 1.33 2740 seventy three .eighty two seven 2.two 2.3
Y2E1-801-two .seventy five one 1.83 1.74 2830 seventy five .eighty three seven.five 2.two two.3
Y2E1-802-two one.one one.five two.fifty eight two.45 2830 seventy seven .84 seven.9 2.2 2.3
Y2E1-90S-two 1.five 2 three.forty three 3.26 2840 seventy nine .eighty four 7.five 2.two two.3
Y2E1-90L-two 2.two 3 four.eighty five four.61 2840 81 .85 7.5 2.2 2.3
Y2E1-100L-two 3 4 6.31 6.00 2870 eighty three .87 7.five two.2 two.3
Y2E1-112M-2 4 five.five 8.twelve seven.72 2880 85 .88 7.five two.two 2.three
Y2E1-132S1-2 five.five seven.five eleven.04 ten.forty nine 2900 86 .88 7.5 2.two 2.three
Y2E1-132S2-2 seven.5 10 fourteen.88 fourteen.fourteen 2900 87 .88 7.five two 2.3
Y2E1-160M1-two eleven 15 21.34 20.27 2940 88 .89 7.five 2 two.three
Y2E1-160M2-two 15 20 28.77 27.33 2940 89 .89 seven.five two 2.three
Y2E1-160L-2 18.five twenty five 34.70 32.ninety seven 2940 ninety .nine 7.5 2 2.three
Y2E1-180M-two 22 thirty 41.27 39.20 2940 ninety .nine seven.five 2 2.two
Y2E1-200L1-two 30 40 55.53 fifty two.seventy five 2950 ninety one.2 .9 seven.5 2 2.two
Y2E1-200L2-2 37 fifty sixty seven.89 64.50 2950 ninety two .9 7.five 2 two.two
Y2E1-225M-2 forty five 60 eighty two.thirteen seventy eight.02 2970 92.3 .9 7.five two 2.two
Y2E1-250M-2 55 seventy five 99.eighty four ninety four.eighty five 2970 92.5 .9 seven.five 2 two.2
Y2E1-280S-two seventy five 100 134.98 128.23 2970 ninety three .9 7.5 two two.2
Y2E1-280M-two ninety one hundred twenty five 161.sixty three 153.55 2980 ninety three.eight .nine seven.five 2 2.2
Y2E1-315S-two a hundred and ten 150 194.35 184.sixty three 2980 94 .91 seven.one 1.eight two.2
Y2E1-315M-2 132 180 232.ninety seven 221.32 2980 94.five .ninety one 7.1 one.8 two.2
Y2E1-315L1-two a hundred and sixty 220 278.73 264.seventy nine 2980 94.6 .92 seven.1 1.8 2.2
Y2E1-315L2-2 two hundred 270 346.58 329.twenty five 2980 ninety four.eight .ninety two 7.1 1.8 two.two
Y2E1-355M-two 250 340 431.87 410.27 2980 95.3 .92 7.1 one.six two.two
Y2E1-355L-2 315 420 544.15 516.ninety four 2980 ninety five.6 .92 seven.one 1.6 two.2
Y2E1-631-4 .12 .sixteen .44 .forty two 1310 fifty seven .72 five.2 two.4 2.two
Y2E1-632-four .18 .twenty five .sixty two .59 1310 60 .seventy three 5.two two.four two.2
Y2E1-711-four .twenty five .34 .79 .75 1330 sixty five .seventy four five.2 two.four 2.two
Y2E1-712-four .37 .5 1.thirteen 1.08 1330 67 .seventy four 5.two 2.4 two.2
Y2E1-801-four .fifty five .75 1.55 one.47 1440 71 .76 five.seven 2.4 two.three
Y2E1-802-4 .seventy five 1 2.03 1.ninety three 1440 73 .seventy seven six 2.3 2.3
Y2E1-90S-4 one.one 1.5 2.89 2.seventy five 1400 seventy five .77 six 2.3 2.3
Y2E1-90L-four 1.five two three.70 three.fifty one 1400 78 .79 6 2.three 2.three
Y2E1-100L1-four two.2 three 5.sixteen 4.ninety 1430 80 .eighty one 7 2.three 2.three
Y2E1-100L2-4 three four six.78 6.44 1430 eighty two .82 seven 2.3 two.3
Y2E1-112M-four 4 5.5 8.eighty two 8.38 1435 84 .82 seven two.3 2.3
Y2E1-132S-4 5.5 seven.five 11.eighty four eleven.twenty five 1440 eighty five .eighty three seven 2.three two.3
Y2E1-132M-four seven.5 ten fifteen.59 14.eighty one 1440 87 .eighty four seven 2.three 2.3
Y2E1-160M-four 11 fifteen 22.61 21.48 1470 88 .eighty four 7 two.two two.three
Y2E1-160L-4 15 twenty thirty.thirteen 28.sixty two 1470 89 .eighty five 7 2.2 two.3
Y2-180M-four eighteen.5 25 36.11 34.31 1460 ninety.5 .86 seven 2.2 2.three
Y2-180L-four 22 30 42.71 40.58 1460 ninety one .86 seven.five 2.2 two.3
Y2-200L-four 30 forty 57.sixty one 54.73 1470 92 .86 7.5 2.2 two.three
Y2-225S-four 37 fifty sixty nine.eighty five 66.36 1470 92.five .87 seven.five two.two two.3
Y2-225M-four forty five 60 eighty four.68 eighty.45 1470 ninety two.8 .87 7.five two.two two.3
Y2-250M-four fifty five 75 103.28 ninety eight.twelve 1470 93 .87 7.2 two.2 two.3
Y2-280S-4 seventy five one hundred 139.sixty four 132.sixty five 1480 ninety three.8 .87 7.two two.2 two.3
Y2-280M-four ninety a hundred twenty five 166.85 158.51 1480 94.2 .87 7.2 two.two 2.3
Y2-315S-four 110 one hundred fifty two hundred.97 one hundred ninety.ninety two 1480 ninety four.5 .88 7.two two.two 2.3
Y2-315M-four 132 a hundred and eighty 240.40 228.38 1485 ninety four.8 .88 seven.2 two.1 two.3
Y2-315L1-4 one hundred sixty 220 291.09 276.54 1485 94.9 .88 six.nine 2.1 2.3
Y2-315L2-four two hundred 270 359.forty 341.43 1485 95 .89 6.nine 2.one two.3
Y2-355M-four 250 340 442.eighty five 420.71 1490 ninety five.3 .9 6.9 2.1 2.two
Y2-355L-four 315 420 556.24 528.43 1485 95.six .9 six.nine 2.one 2.two
Y2E1-711-6 .eighteen .25 .74 .70 850 fifty six .sixty six four one.9 2
Y2E1-712-6 .twenty five .34 .ninety five .ninety 850 59 .sixty eight four one.9 2
Y2E1-801-6 .37 .5 1.30 one.23 890 sixty two .seven 4.7 one.nine two
Y2E1-802-6 .fifty five .seventy five 1.79 one.70 890 65 .seventy two four.7 one.9 2
Y2E1-90S-6 .seventy five 1 2.eighteen 2.07 910 seventy two.seven .72 5.5 two 2.1
Y2E1-90L-6 one.one 1.5 3.01 two.86 910 seventy six .73 5.5 2 2.1
Y2E1-100L-six one.five two 3.85 three.65 940 seventy nine .75 five.5 2 2.1
Y2E1-112M-six 2.two three five.43 five.sixteen 940 eighty one .seventy six 6.five 2 two.one
Y2E1-132S-six 3 four seven.31 6.95 960 eighty two .seventy six six.5 two.1 two.1
Y2E1-132M1-6 four 5.5 nine.fifty two 9.04 960 84 .seventy six six.five 2.1 two.1
Y2E1-132M2-six 5.5 7.five twelve.sixty two 11.ninety nine 960 86 .77 six.5 two.1 2.1
Y2E1-160M-six seven.five ten 16.ninety one sixteen.07 970 87.5 .seventy seven 6.5 2 2.one
Y2E1-160L-six eleven fifteen 23.eighteen 22.02 970 89 .81 6.five two two.one
Y2E1-180L-six 15 20 31.26 29.70 980 ninety .81 six.5 two.1 2
Y2E1-200L1-6 eighteen.five twenty five 37.63 35.seventy five 980 90 .eighty three 6.5 two.one 2
Y2E1-200L2-six 22 thirty 43.25 forty one.09 980 92 .eighty four seven 2.one 2
Y2E1-225M-6 thirty forty fifty seven.30 fifty four.43 980 ninety two.five .86 seven two.one two
Y2E1-250M-six 37 fifty 70.forty four 66.ninety two 980 92.eight .86 seven 2 2
Y2E1-280S-6 45 60 eighty five.03 80.seventy eight 990 ninety three.5 .86 seven 2 two
Y2E1-280M-six 55 seventy five 103.59 98.forty one 990 ninety three.eight .86 7 2 two
Y2E1-315S-six 75 a hundred 139.34 132.37 990 ninety four .87 6.7 two two
Y2E1-315M-6 90 one hundred twenty five 168.seventy nine one hundred sixty.35 990 94.2 .86 six.7 2 two
Y2E1-315L1-6 110 a hundred and fifty 200.ninety seven 190.ninety two 990 ninety four.5 .88 6.seven 2 2
Y2E1-315L2-six 132 180 240.66 228.sixty two 990 ninety four.seven .88 6.7 1.9 2
Y2E1-355M1-six a hundred and sixty 220 292.01 277.41 990 ninety four.six .88 six.7 1.9 two
Y2E1-355M2-6 200 270 363.86 345.sixty seven 990 ninety four.9 .88 six.seven 1.9 2.1

Why us? 

one.Minimal MOQ: It can meet your promotional enterprise very well.
  
2.Excellent Services : We handle clients as pals,offering 24 hrs a times 7days a week provider help.

 three.Very good Top quality :We have stringent top quality handle method.Great reputation in the market place.
 
four.Quick & Cheap Supply: We have massive low cost from CZPTer.

FAQ

Q: Do you offer you OEM support?

A: Yes 

Q: What is your payment term?

A: thirty% T/T in advance, 70% equilibrium when receiving B/L copy.  Or irrevocable L/C.

Q: What is your lead time?

A: About thirty days following getting deposit or authentic L/C.

 

 

Yx3 80-4 0.75kw High Efficienct Three Phase AC Induction Electric Motor